⚡ Electrical Weekly Report Summary
3rd Week of March 2026 (March 15–22)
TW‑DCD Department – Johnny Austria & Joseph Cristal Jr.
🛠️ Overall Scope of Work
Across the week, the team completed 15 documented tasks involving:
- Preventive Maintenance (PM)
- Load Balancing
- Electrical Works
- Breaker Replacement
- Dismantling and Pull‑out of Electrical Connections
Most activities focused on panel boards, with some work on lighting and CCTV installation.
All tasks were marked OK, with no pending issues reported.
📍 Key Activities by Category
🔧 1. Preventive Maintenance & Load Balancing
Performed repeatedly across multiple branches:
- PSMU
– SM Muntinlupa
“PREVENTIVE MAINTENANCE AND LOAD BALANCING PSMU” - PRGS
– Robinsons Galleria South, San Pedro Laguna
“Preventive Maintenance and Load balancing ” - PSIM
– SM Center Imus
“Preventive Maintnance and Load Balancing.” - PWDC
– Waltermart Dasmariñas
“Preventive Maintenance and Load balancing” - PPL‑1
– Xsite Festival Mall Alabang
“Preventive Maintenance and Load Balancing” - PEWF
– East West Festival Mall Alabang
“Preventive Maintenance and Load balancing”
🔌 2. Electrical Works
- PPL1 X‑Site EE Room 32R – Electrical works + PM
- PPL1 X‑Site – Load balancing
- PRFC – Electrical PM and load balancing
- General electrical works across multiple branches as shown in the PPT.
🔧 3. Corrective Maintenance
- RSP
– Robinsons Starmill Pampanga
“2 defective breakers replaced” on March 19.
Another visit on March 17 noted defective breakers needing replacement.
🛠️ 4. Additional Works
- MSP
– Funhouse
Installation of additional CCTV camera.
“ADDIONAL CCTV CAMERA AT MSP”
🏗️ 5. Dismantling & Pull‑Out
- PSPD
– SM San Pedro
“Dismantled Electrical Supply PSPD satellite… and pullout electrical.”
“DISMANTLED ELECTRICAL CONNECTIONS AND PULLED OUT THE MACHINES FROM THE PSPD SATELLITE.”
👥 Personnel Involved
Primary team for TW‑DCD:
- Johnny Austria
- Joseph Cristal Jr.
Other teams handled additional branches:
- Chris Neri / Ronil Jardio
- Jerico Simon / Petemar Solano
All tasks were verified by respective branch representatives.
✅ Overall Assessment
The week shows consistent preventive maintenance coverage, successful load balancing, and timely corrective actions. All branches serviced were left in operational condition, with no unresolved issues reported.