Accomplishment Report Summary (January–December 2025)

Annual Report


1. Electrical Installations & Store Enhancements

  • Smart LED installation and wiring optimization for Tomsworld SM Molino
  • Revised wiring diagrams to reduce voltage drop
  • Installation and replacement of high‑bay dome lights (Ever Gotesco Commonwealth)
  • Installation of extensions and additional lighting for multiple branches
  • Construction and electrical setup of SM Novaliches Tempo Area
  • Relocation and installation of LED downlights (SM Telabastagan)

2. Electrical Plans, Load Computations & Technical Drawings

Completed electrical plans and as‑built revisions for:

  • SM East Ortigas Expansion
  • Funhouse Tanay Town Center
  • Tomsworld SM Novaliches
  • Tomsworld SM Lucena
  • Tomsworld Iloilo Market Mall
  • Tomsworld Gaisano Liloan
  • Robinsons Place Tacloban (As‑built & Proposed)
  • 168 Mall Divisoria (Proposed & Revised Plans)
  • SM Megamall Satellite Area
  • Funhouse Puregold QI Central
  • TW SM Lucena (BOM & Cost Estimate)

Additional technical outputs:

  • Load consumption computation for SM Palawan
  • Updated electrical forms (Load Balancing, Megger Test, PM Checklist)

3. Preventive Maintenance (Nationwide)

Successful PM activities across North, Central, South, Visayas, and Mindanao clusters, including:

  • SM San Jose, Starmall San Jose, EB Town Center
  • SM Fairview, Robinsons Nova, Montalban Town Center
  • SM North Caloocan, Waltermart North Edsa
  • SM East Ortigas, Robinsons Cainta, Tanay Town Center
  • SM Fairview, SM Baliuag, SM Pulilan, Waltermart Plaridel
  • Robinsons Cabanatuan, SM Cabanatuan, Robinsons Gapan
  • Robinsons Angeles, SM Pampanga, Waltermart San Fernando
  • SM Tarlac, SM Rosales, Robinsons Ilocos, Puregold Ilocos
  • SM Tuguegarao, Robinsons Tuguegarao
  • SM Daet, SM Sorsogon, SM Legazpi, LCC Legazpi
  • Festival Mall (Pixie), SM Muntinlupa
  • SM Bacoor, SM Dasmariñas, Waltermart Carmona
  • Robinsons Imus, Waltermart Dasmariñas
  • SM Center Molino, RFC Mall, SM Southmall
  • SM Las Piñas, SM Sucat
  • SM Iloilo, SM Roxas, SM Seaside Cebu, SM Cebu
  • Gaisano Masbate, LCC Masbate
  • SM Palawan, Robinsons Palawan
  • Robinsons North Tacloban, Robinsons Marasbaras
  • SM Davao, Robinsons Iligan, Robinsons Butuan, Gaisano Surigao

4. Emergency Electrical Works & Troubleshooting

Completed urgent responses for:

  • Short circuit repair at SM Mall of Asia
  • Power‑on delay troubleshooting at Funhouse Montalban
  • Circuit breaker replacement and repairs (multiple branches)
  • Floor outlet troubleshooting at SM Mall of Asia
  • Electrical insulation checks due to water leaks (Tutuban Center Mall)
  • Emergency power supply repairs at SM Pampanga
  • Machine relocation and load balancing for various branches

5. CCTV Installations & Upgrades

  • Roughing‑ins and BOM preparation for Funhouse Taguig
  • CCTV installation for Pixie
  • Ocular inspections and BOM for CCTV upgrades (SM San Lazaro, Ever Gotesco Commonwealth)
  • Installation of new CAT6 cables for CCTV upgrades

6. Smart LED / ESP32 Development & Automation

Completed firmware and software development:

  • Refactoring WLED v14.4 for ESP32 memory optimization
  • ESP32 reset code creation and testing
  • Firmware updates: V15.1, V16.0, V16.1, V16.1b, V16.2
  • Added features: PST timezone, blend modes, sound‑reactive effects
  • Development of TWLED/WLED GUI using AI
  • Creation of Project Tracker Web App
  • Creation of Preventive Maintenance Web App (launched on GitHub + Firebase)

7. Ocular Inspections & Site Assessments

  • Multiple site inspections for electrical provisions, LED measurements, CCTV routing, and demolition assessments
  • Coordination with mall engineering teams for compliance and safety
  • Verification of panel board conditions based on thermography reports

8. Machine Relocation & Load Balancing

  • Full load tests and load distribution for SM Novaliches
  • Machine relocation and load balancing across multiple Luzon branches
  • Ensured compliance with PEC standards and operational safety

 

Alexander Fernandez

Electrical Design Engineer with nearly 19 years of experience specializing in the planning, development, and organization of comprehensive electrical systems. Skilled in ensuring stable and reliable power supply across multiple facilities, conducting on‑site meetings and inspections throughout all project phases, and overseeing testing and commissioning of newly installed equipment. Proven ability to manage technical requirements, maintain operational continuity, and deliver high‑quality engineering solutions.

More From Author

The Importance of Electrical Design Analysis

End of January 2026 Electrical Accomplishment Summary

Leave a Reply

Your email address will not be published. Required fields are marked *