Electrical Weekly Report – Summary (2nd Week of February 2026)
TW‑DCD Department
Prepared by: Johnny Austria
With: Joseph Cristal Jr.
1. Corrective Maintenance
PCSM Showroom
- Replaced a defective panel light.
(Slide reference: “REPLACED THE DEFECTIVE PANEL LIGHT AT PCSM SHOWROOM”)
2. Preventive Maintenance Activities
Preventive maintenance was conducted across multiple sites:
PPLP
- General preventive maintenance tasks
- Load balancing activities
(Slides: “PREVENTIVE MAINTENANCE – PPLP”, “LOAD BALANCING – PPLP”)
PPLP Tempo 2
- Preventive maintenance
- Load balancing
(Slides: “PREVENTIVE MAINTENANCE – PPLP TEMPO 2”, “LOAD BALANCING – PPLP TEMPO 2”)
PSXS
- Preventive maintenance
- Load balancing
(Slides: “PREVENTIVE MAINTENANCE – PSXS”, “LOAD BALANCING – PSXS”)
PSSA
- Preventive maintenance
- Load balancing
(Slides: “Preventive maintenance – PSSA”, “Load balancing – PSSA”)
PSLP
- Preventive maintenance
- Load balancing
(Slides: “Preveventive maintenance – PSLP”, “Load balancing – PSLP”)
3. Electrical Works
PSLP
- Various electrical works performed
(Slide: “ELECTRICAL WORKS – PSLP”)
PPLP
- Additional electrical works
(Slide: “ELECTRICAL WORKS – PPLP”)
SMU Satellite
- Relocation of machines requiring electrical adjustments
(Slide: “Electrical works Relocation of machines SMU satellite”)
4. Fabrication Work
- Fabricated a bracket for the X‑Site Redemption – Tom’s World signage
(Slide: “Fabricated a bracket for the X‑Site Redemption Tom’s World signage”)