📌 SUMMARY REPORT — 1st & 2nd Week of March 2026
TW-DCD Department — Electrical Team (Johnny Austria & Joseph Cristal Jr.)
🟦 1ST WEEK OF MARCH 2026 (March 1–7)
✅ Major Activities
- Preventive Maintenance (PM) and Load Balancing across multiple JA Claw, Pambi Corp, Joy Planet, and Funhouse branches.
- Corrective works including removal of unsafe busbar and replacement of busted lights.
- Support for mall operations (Festival Mall, SM branches, Puregold, Waltermart).
🛠️ Key Tasks Completed
- PSLO
– PM and load balancing
“Pm and balancing load” - PUSO
– PM and load balancing
“Preventive maintenance and load balancing” - PSQE – PM, load balancing, and removal of busbar with no breaker
- PWQE – PM and load balancing
- PSTG – PM and load balancing
- PL1
Warehouse – Installed additional lighting
“Replace Busted lights warehouse pl1” - Funhouse
& Tomsworld branches – Multiple PM and load balancing tasks
“LOAD BALANCE & CLEANING PANEL BOARD”
⚡ Notable Issues Addressed
- Burned-out
MDP wire at Puregold Marikina (PYM)
“Electrical emergency Response (Repair on burned out MDP wire)” - Multiple
defective breakers replaced (RTC Tuguegarao)
“Brach ckt #2,27 and 12 defective breakers have been replaced”
🟩 2ND WEEK OF MARCH 2026 (March 8–15)
Major Activities
- Thermal scanning assistance, load balancing, and preventive maintenance across PSCM, PSDQ, PSTO, PPL1, and other branches.
- Emergency response at SM Molino due to humming magnetic contactor.
- Breaker replacement at PSRC.
Key Tasks Completed
- PSTO
– Assisted mall admin with thermal scanning and load balancing
“Assist to admin and Engineering… for re thermal scanning and load balancing” - PSDQ – Preventive maintenance and load balancing
- PSCM
– Load balancing and emergency response
“the humming panel breaker caused by the magnetic contactor has already been repaired” - PPL1 (X1, X2, X3, X4, Galore) – Multiple PM and load balancing activities
- PSTH – Electrical works and load balancing
- PSRC
– Replaced defective breaker
“REPLACE DEFECTIVE BREAKER”
Notable Issues Addressed
- Emergency repair at SM Molino (magnetic contactor humming).
- Continuous
monitoring required for replaced MDP breaker at PYM.
“Subject for continuous monitoring after installation”
OVERALL SUMMARY (March 1–15, 2026)
🔧 Total Workload
- 29 recorded tasks across two weeks.
- Majority of tasks involved:
- Preventive Maintenance
- Load Balancing
- Electrical corrective works
- Emergency response
- Coordination with mall engineering/admin teams
🏢 Main Locations Covered
- SM branches (San Pablo, Calamba, Molino, Sto. Tomas, Tuguegarao, North Edsa, San Lazaro)
- Puregold branches
- Festival Mall Alabang
- Waltermart branches
- Robinsons Malls
- Various satellite and x-site locations
👷 Primary Personnel
- Johnny Austria & Joseph Cristal Jr. (majority of PM and load balancing tasks)
- Supported by: Jerico Simon, Petemar Solano, Ronil Jardio, Chris Neri, and others depending on branch.