Electrical Weekly Report – Summary (2nd Week of February 2026)

Electrical Weekly Report – Summary (2nd Week of February 2026)

TW‑DCD Department
Prepared by: Johnny Austria
With: Joseph Cristal Jr.

1. Corrective Maintenance

PCSM Showroom

  • Replaced a defective panel light.
    (Slide reference: “REPLACED THE DEFECTIVE PANEL LIGHT AT PCSM SHOWROOM”)

2. Preventive Maintenance Activities

Preventive maintenance was conducted across multiple sites:

PPLP

  • General preventive maintenance tasks
  • Load balancing activities
    (Slides: “PREVENTIVE MAINTENANCE – PPLP”, “LOAD BALANCING – PPLP”)

PPLP Tempo 2

  • Preventive maintenance
  • Load balancing
    (Slides: “PREVENTIVE MAINTENANCE – PPLP TEMPO 2”, “LOAD BALANCING – PPLP TEMPO 2”)

PSXS

  • Preventive maintenance
  • Load balancing
    (Slides: “PREVENTIVE MAINTENANCE – PSXS”, “LOAD BALANCING – PSXS”)

PSSA

  • Preventive maintenance
  • Load balancing
    (Slides: “Preventive maintenance – PSSA”, “Load balancing – PSSA”)

PSLP

  • Preventive maintenance
  • Load balancing
    (Slides: “Preveventive maintenance – PSLP”, “Load balancing – PSLP”)

3. Electrical Works

PSLP

  • Various electrical works performed
    (Slide: “ELECTRICAL WORKS – PSLP”)

PPLP

  • Additional electrical works
    (Slide: “ELECTRICAL WORKS – PPLP”)

SMU Satellite

  • Relocation of machines requiring electrical adjustments
    (Slide: “Electrical works Relocation of machines SMU satellite”)

4. Fabrication Work

  • Fabricated a bracket for the X‑Site Redemption – Tom’s World signage
    (Slide: “Fabricated a bracket for the X‑Site Redemption Tom’s World signage”)

More From Author

First Week of February Accomplishment Report

Accomplishment Report for the month of February 2026

Leave a Reply

Your email address will not be published. Required fields are marked *