First and Second Week of March 2026 Accomplishment Report

📌 SUMMARY REPORT — 1st & 2nd Week of March 2026

TW-DCD Department — Electrical Team (Johnny Austria & Joseph Cristal Jr.)

🟦 1ST WEEK OF MARCH 2026 (March 1–7)

Major Activities

  • Preventive Maintenance (PM) and Load Balancing across multiple JA Claw, Pambi Corp, Joy Planet, and Funhouse branches.
  • Corrective works including removal of unsafe busbar and replacement of busted lights.
  • Support for mall operations (Festival Mall, SM branches, Puregold, Waltermart).

🛠️ Key Tasks Completed

  • PSLO – PM and load balancing
    “Pm and balancing load”
  • PUSO – PM and load balancing
    “Preventive maintenance and load balancing”
  • PSQE – PM, load balancing, and removal of busbar with no breaker
  • PWQE – PM and load balancing
  • PSTG – PM and load balancing
  • PL1 Warehouse – Installed additional lighting
    “Replace Busted lights warehouse pl1”
  • Funhouse & Tomsworld branches – Multiple PM and load balancing tasks
    “LOAD BALANCE & CLEANING PANEL BOARD”

Notable Issues Addressed

  • Burned-out MDP wire at Puregold Marikina (PYM)
    “Electrical emergency Response (Repair on burned out MDP wire)”
  • Multiple defective breakers replaced (RTC Tuguegarao)
    “Brach ckt #2,27 and 12 defective breakers have been replaced”

🟩 2ND WEEK OF MARCH 2026 (March 8–15)

Major Activities

  • Thermal scanning assistance, load balancing, and preventive maintenance across PSCM, PSDQ, PSTO, PPL1, and other branches.
  • Emergency response at SM Molino due to humming magnetic contactor.
  • Breaker replacement at PSRC.

Key Tasks Completed

  • PSTO – Assisted mall admin with thermal scanning and load balancing
    “Assist to admin and Engineering… for re thermal scanning and load balancing”
  • PSDQ – Preventive maintenance and load balancing
  • PSCM – Load balancing and emergency response
    “the humming panel breaker caused by the magnetic contactor has already been repaired”
  • PPL1 (X1, X2, X3, X4, Galore) – Multiple PM and load balancing activities
  • PSTH – Electrical works and load balancing
  • PSRC – Replaced defective breaker
    “REPLACE DEFECTIVE BREAKER”

Notable Issues Addressed

  • Emergency repair at SM Molino (magnetic contactor humming).
  • Continuous monitoring required for replaced MDP breaker at PYM.
    “Subject for continuous monitoring after installation”

OVERALL SUMMARY (March 1–15, 2026)

🔧 Total Workload

  • 29 recorded tasks across two weeks.
  • Majority of tasks involved:
  • Preventive Maintenance
  • Load Balancing
  • Electrical corrective works
  • Emergency response
  • Coordination with mall engineering/admin teams

🏢 Main Locations Covered

  • SM branches (San Pablo, Calamba, Molino, Sto. Tomas, Tuguegarao, North Edsa, San Lazaro)
  • Puregold branches
  • Festival Mall Alabang
  • Waltermart branches
  • Robinsons Malls
  • Various satellite and x-site locations

👷 Primary Personnel

  • Johnny Austria & Joseph Cristal Jr. (majority of PM and load balancing tasks)
  • Supported by: Jerico Simon, Petemar Solano, Ronil Jardio, Chris Neri, and others depending on branch.

 